The project included the immediate readiness of our company’s fully qualified workshops, throughout the 24 hours and for a total of three (3) years, to deal with emergency leaks in pipes and valves of the water supply network, repair and reconstruction works in wells and pipes of the drainage network as well as restoring road surfaces and sidewalks to the priority, before the immediate intervention, condition. The area of immediate intervention extended to three (3) Municipal Units of the Municipality of Rhodes, namely the center of Rhodes, the D.E. Ialyssou and D.E. Kallithea. Specifically, our company offered technical solutions:
It was one of the most specialized Plumbing Projects undertaken by our company, due to the need for immediate intervention, immediate provision of a technical solution despite the impossibility of prior knowledge of the locations of the intervention and immediate coordination and time planning of our workshops. |